VCU Community Memorial Hospital

ACI designed and constructed pre-manufactured piping, electrical, and wood blocking in a panelized wall system, which was then transported to the site and installed in the patient rooms. Other pre-fabricated efforts on the project included skids and piping for the boiler and chiller plant that were shop-fabricated and shipped fully assembled to the site. What […]

Project CVG200 & CVG300

In the dynamic landscape of today’s world, data centers play an increasingly vital role. Essential for the continuous operation of our global infrastructure, these data centers operate around the clock, 365 days a year. TP Mechanical proudly collaborated with Pepper Construction to successfully fulfill the plumbing requirements for this mission-critical facility.

University of North Carolina School of the Arts

This particular project involved replacing the campus’ (2) main cooling towers and associated condenser water piping as well as a few small indoor air handling units responsible for heating and cooling classrooms and music practice spaces. Professional Air Responsibilities include: Demolition of (1) existing tower Relocation of (1) existing tower from the Utility Plan Area […]

Praxair Delaware City CO2 Plant

Atlantic Constructors was selected as the construction manager for this 400 TPD CO2 Plant at the Delaware City Refinery in the Wilmington area. This plant was a 5-tank plant with three base plant process mega skids enclosed in a central building. The site was developed to provide for both rail and truck fill operations to […]

Big Walnut Elementary Mechanical Room

To ensure the installation of piping and equipment went as effortlessly and fast as possible, TP built the entire mechanical room in our 100,000 square foot distribution center.