Big Walnut Elementary Mechanical Room

To ensure the installation of piping and equipment went as effortlessly and fast as possible, TP built the entire mechanical room in our 100,000 square foot distribution center. The mechanical room was completely pre-assembled while the energy plant structure was simultaneously being built.  Once the building was dried-in, the pre-assembled portion of the mechanical room was broken down into segments, then shipped to the job site to allow for an efficient and expedited installation. From disassembly to reassembly on-site, the process was performed in a period of four days.

Owner

Big Walnut Local School District

City, State

Sunbury, OH

Status

Complete

Service(s)

Plumbing, HVAC (full mechanical rooms)

PROJECT COMPLETED BY

TP_Mechanical_Logo