Microsoft Data Center
Construction of 515,000 SF Multi-Phase Data Center. ACI was awarded the project based on qualifications and fees to perform the mechanical scope of work. PROJECT HIGHLIGHTS HVAC systems, domestic water, sanitary waste/vent, industrial water/waste, condensate drainage, storm drainage systems, and fire protection systems. Installation of 190 AHU’s with evaporative cooling Installation of utility supports Utilization […]
CPKC Stadium
Temp-Con was brought in to handle all HVAC equipment, ductwork, refrigeration piping, kitchen equipment in the concession stands, and the sub-air system under the field for this project. This project is the world’s first women’s specific stadium, attracting much global interest. A notable aspect of the project is the innovative SUBAIR system, designed to heat […]
University of North Carolina School of the Arts
This particular project involved replacing the campus’ (2) main cooling towers and associated condenser water piping as well as a few small indoor air handling units responsible for heating and cooling classrooms and music practice spaces. Professional Air Responsibilities include: Demolition of (1) existing tower Relocation of (1) existing tower from the Utility Plan Area […]
Forsyth Tech Transportation Center Expansion
This particular project is 22,000 square feet metal building addition to an existing transportation education facility. Professional Air Responsibilities include: Connecting existing heating and chilled water lines from the existing campus to the new building Rooftop exhaust fans and intake hoods servicing automative maintenance areas Indoor blower / fan coil units, high velocity low speed […]
Gulfstream Component Repair & Overhaul Facility
Luxury and quality are synonymous with the Gulfstream brand. As part of their world-class customer service, Gulfstream has strategically located their Component Repair & Overhaul (R&O) Facilities across the nation. R&O facilities are specially equipped to maintain and rebuild airplane parts to be of factory quality. The Fort Worth location sits on nine acres and […]
Lego Warehouse
ACI was awarded the Mechanical, Electrical, Plumbing, and Fire Protection scopes for an upfit to an existing 257,000 SF warehouse. This facility serves as a temporary training location for new hires of the permanent Lego facility soon to be constructed nearby. The warehouse work included new HVAC units, an additional electrical switchboard, lighting, copious amounts […]
Methodist Celina Medical Center & POB
The Methodist Celina Medical Center & POB Project included (60) beds ranging across 200,000-SF on a 46-acre greenspace. Our Polk team was responsible for the mechanical and plumbing scope, including controls, med-gas wiring, pipe insulation, and fuel oil systems. The Methodist Celina Medical Center represents a milestone for the community, as the first major hospital […]
VCU Children’s Hospital of Richmond
ACI served as the Mechanical and Plumbing Trades Contractor as well as Fire Protection Contractor during the construction of this 640,000 SF hospital with exam rooms, operating rooms, labs, and offices. Working with Skanska, U.S.A. on Design Assist throughout the pre- construction period, ACI participated in multiple design iterations and contributed to value management exercises. […]
ROLLS ROYCE – CROSSPOINTE CENTER
Construction of new 200,000 SF Manufacturing Facility & Central Plant 800-Ton Central Utility Plant 3120 GPM Cooling Towers 6000 MBH Condensing Boiler Systems Central Station Air Handling Units – 261,000 CF Domestic Plumbing & Natural Gas LEED Certified BIM
Choctaw Casino & Resort Hotel Tower
With around-the-clock card dealing and dice rolling, the Choctaw Casino & Resort never closes. Constructing a new high-rise hotel tower required a lot of collaboration and coordination with the project team to ensure the safety of guests and staff and working with a minimal laydown yard. The 21-story hotel expansion includes 1,000 guest keys, a […]