CPKC Stadium

Temp-Con was brought in to handle all HVAC equipment, ductwork, refrigeration piping, kitchen equipment in the concession stands, and the sub-air system under the field for this project. This project is the world’s first women’s specific stadium, attracting much global interest. A notable aspect of the project is the innovative SUBAIR system, designed to heat […]

University of North Carolina School of the Arts

This particular project involved replacing the campus’ (2) main cooling towers and associated condenser water piping as well as a few small indoor air handling units responsible for heating and cooling classrooms and music practice spaces. Professional Air Responsibilities include: Demolition of (1) existing tower Relocation of (1) existing tower from the Utility Plan Area […]

Forsyth Tech Transportation Center Expansion

This particular project is 22,000 square feet metal building addition to an existing transportation education facility. Professional Air Responsibilities include: Connecting existing heating and chilled water lines from the existing campus to the new building Rooftop exhaust fans and intake hoods servicing automative maintenance areas Indoor blower / fan coil units, high velocity low speed […]

Gulfstream Component Repair & Overhaul Facility

Luxury and quality are synonymous with the Gulfstream brand. As part of their world-class customer service, Gulfstream has strategically located their Component Repair & Overhaul (R&O) Facilities across the nation. R&O facilities are specially equipped to maintain and rebuild airplane parts to be of factory quality. The Fort Worth location sits on nine acres and […]

Methodist Celina Medical Center & POB

The Methodist Celina Medical Center & POB Project included (60) beds ranging across 200,000-SF on a 46-acre greenspace. Our Polk team was responsible for the mechanical and plumbing scope, including controls, med-gas wiring, pipe insulation, and fuel oil systems. The Methodist Celina Medical Center represents a milestone for the community, as the first major hospital […]

Choctaw Casino & Resort Hotel Tower

active job site

With around-the-clock card dealing and dice rolling, the Choctaw Casino & Resort never closes. Constructing a new high-rise hotel tower required a lot of collaboration and coordination with the project team to ensure the safety of guests and staff and working with a minimal laydown yard. The 21-story hotel expansion includes 1,000 guest keys, a […]

Methodist Midlothian Medical Center

Methodist Midlothian Medical Center

No utilities infrastructure existed when Polk Mechanical was engaged to build this 5-five story hospital. To serve the growing community of Midlothian, the hospital’s fifth level was constructed as shell space for future expansion. The hospital’s CUP was full prefabricated and installed within a month.

High Point Regional Hospital

High Point Regional Hospital systems

Completed in 2019, CAS added ten operating room suites to the 3rd floor of the existing hospital. The project scope included HVAC, plumbing and mechanical piping with a value of over $10 million.

Project Superbowl (FOE1-KC)

active job site - Project Superbowl

In October of 2020, Temp-Con, LLC was given the Notice to Proceed to start work at Project Superbowl. Our scope of work included all shop drawings, BIM Design and Coordination, release and purchase of 78 RTU’s, 44 Smoke Exhaust Fans, 59 Louver Intakes, 13 Mini Splits and 8 HVLS Fans. This massive building sits on […]

Basehor Linwood Elementary School

Basehor Linwood Elementary School duct work

This 52,000 sq ft project involved 2 classroom additions along with a Performing Arts Center. In April of 2020 we were on site to start the HVAC portion of this project. Our scope of work included providing and installing 8 RTU’s, 16 VAV’s, 2599 linear ft of ductwork and 750 ft of duct wrap.