Microsoft Data Center

Construction of 515,000 SF Multi-Phase Data Center. ACI was awarded the project based on qualifications and fees to perform the mechanical scope of work. PROJECT HIGHLIGHTS HVAC systems, domestic water, sanitary waste/vent, industrial water/waste, condensate drainage, storm drainage systems, and fire protection systems. Installation of 190 AHU’s with evaporative cooling Installation of utility supports Utilization […]

CPKC Stadium

Temp-Con was brought in to handle all HVAC equipment, ductwork, refrigeration piping, kitchen equipment in the concession stands, and the sub-air system under the field for this project. This project is the world’s first women’s specific stadium, attracting much global interest. A notable aspect of the project is the innovative SUBAIR system, designed to heat […]

Gulfstream Component Repair & Overhaul Facility

Luxury and quality are synonymous with the Gulfstream brand. As part of their world-class customer service, Gulfstream has strategically located their Component Repair & Overhaul (R&O) Facilities across the nation. R&O facilities are specially equipped to maintain and rebuild airplane parts to be of factory quality. The Fort Worth location sits on nine acres and […]

Lego Warehouse

ACI was awarded the Mechanical, Electrical, Plumbing, and Fire Protection scopes for an upfit to an existing 257,000 SF warehouse. This facility serves as a temporary training location for new hires of the permanent Lego facility soon to be constructed nearby. The warehouse work included new HVAC units, an additional electrical switchboard, lighting, copious amounts […]

Methodist Celina Medical Center & POB

The Methodist Celina Medical Center & POB Project included (60) beds ranging across 200,000-SF on a 46-acre greenspace. Our Polk team was responsible for the mechanical and plumbing scope, including controls, med-gas wiring, pipe insulation, and fuel oil systems. The Methodist Celina Medical Center represents a milestone for the community, as the first major hospital […]

VCU Children’s Hospital of Richmond

ACI served as the Mechanical and Plumbing Trades Contractor as well as Fire Protection Contractor during the construction of this 640,000 SF hospital with exam rooms, operating rooms, labs, and offices. Working with Skanska, U.S.A. on Design Assist throughout the pre-construction period, ACI participated in multiple design iterations and contributed to value management exercises. PROJECT […]

Rolls Royce – Crosspointe Center

Construction of new 200,000 SF Manufacturing Facility & Central Plant 800-Ton Central Utility Plant 3120 GPM Cooling Towers 6000 MBH Condensing Boiler Systems Central Station Air Handling Units – 261,000 CF Domestic Plumbing & Natural Gas LEED Certified BIM

Choctaw Casino & Resort Hotel Tower

active job site

With around-the-clock card dealing and dice rolling, the Choctaw Casino & Resort never closes. Constructing a new high-rise hotel tower required a lot of collaboration and coordination with the project team to ensure the safety of guests and staff and working with a minimal laydown yard. The 21-story hotel expansion includes 1,000 guest keys, a […]

Methodist Midlothian Medical Center

Methodist Midlothian Medical Center

No utilities infrastructure existed when Polk Mechanical was engaged to build this 5-five story hospital. To serve the growing community of Midlothian, the hospital’s fifth level was constructed as shell space for future expansion. The hospital’s CUP was full prefabricated and installed within a month.

Project Superbowl (FOE1-KC)

active job site - Project Superbowl

In October of 2020, Temp-Con, LLC was given the Notice to Proceed to start work at Project Superbowl. Our scope of work included all shop drawings, BIM Design and Coordination, release and purchase of 78 RTU’s, 44 Smoke Exhaust Fans, 59 Louver Intakes, 13 Mini Splits and 8 HVLS Fans. This massive building sits on […]