High Point Regional Hospital

Completed in 2019, CAS added ten operating room suites to the 3rd floor of the existing hospital. The project scope included HVAC, plumbing and mechanical piping with a value of over $10 million.

Completed in 2019, CAS added ten operating room suites to the 3rd floor of the existing hospital. The project scope included HVAC, plumbing and mechanical piping with a value of over $10 million.