Construction of 515,000 SF Multi-Phase Data Center. ACI was awarded the project based on qualifications and fees to perform the mechanical scope of work.
PROJECT HIGHLIGHTS
- HVAC systems, domestic water, sanitary waste/vent, industrial water/waste, condensate drainage, storm drainage systems, and fire protection systems.
- Installation of 190 AHU’s with evaporative cooling
- Installation of utility supports
- Utilization of BIM for coordination and pre-fabrication
- Commissioning support
- Design Assist Scope
- Design of utility support systems
- Recommended modifications to AHU duct connections to building
- ASME B31.3 Process Piping Code for X-Ray Quality Welding
- Design of interior flashing solutions