Microsoft Data Center

Construction of 515,000 SF Multi-Phase Data Center. ACI was awarded the project based on qualifications and fees to perform the mechanical scope of work.

PROJECT HIGHLIGHTS

  • HVAC systems, domestic water, sanitary waste/vent, industrial water/waste, condensate drainage, storm drainage systems, and fire protection systems.
  • Installation of 190 AHU’s with evaporative cooling
  • Installation of utility supports
  • Utilization of BIM for coordination and pre-fabrication
  • Commissioning support
  • Design Assist Scope
  • Design of utility support systems
  • Recommended modifications to AHU duct connections to building
  • ASME B31.3 Process Piping Code for X-Ray Quality Welding
  • Design of interior flashing solutions

Owner

Microsoft

City, State

Boydton, VA

Status

Completed 2014

Service(s)

HVAC, Mechanical